Build & Delivery

What a Northern Beaches duplex actually costs in 2027: the line items

The build contract is the biggest number in the feasibility. It is never the only one. Owners who budget for the builder and nothing else are the ones who run out of money at lock-up.

The lines that make up a duplex

Line itemIndicative rangeNotes
Demolition and site clearing$30k–$60kAsbestos, tree removal and tip fees push the top end
Survey, geotech, arborist, stormwater$10k–$20kDone before design, not after
Architect and design$40k–$80kTwo homes, not one. Council-ready drawings
Town planner, BASIX, Section 10.7, approval fees$15k–$35kHigher on a DA than a CDC
Certifier and inspections$8k–$15kThrough to Occupation Certificate
Construction — two 4-bed homes$1.6m–$2.2mSite conditions and spec drive the spread
Siteworks: retaining, driveways, OSD$60k–$150kSlope is the variable. Belrose costs more than Dee Why
Service connections and utilities$15k–$40kSydney Water, Ausgrid, NBN
Landscaping and fencing$25k–$60kBuyers judge the house from the street
Subdivision, linen plan, titles$15k–$30kCreates the two Torrens titles
Finance costs over the programdepends on structureInterest capitalised over 14–20 months
Agent, marketing, legal at sale2–3% of sale price plus marketingTwo sales, two campaigns
Contingency5–10% of buildNon-negotiable in our feasibilities

What moves the construction number

Why fixed scope matters more than fixed price

A builder's fixed price is only fixed for the scope it describes. Variations are where budgets die. Our contracts tie down scope line by line before settlement, with provisional sums kept to a minimum and allowances set at real selection prices. If a client wants to upgrade later, they pay for it knowingly. They do not find it in a variation at frame stage.

Where owners save and where they shouldn't

Save on: the things buyers never see. Over-engineering a slab the engineer did not ask for. Design changes after approval.

Don't save on: the street elevation, the kitchen, the master bathroom, the landscaping. These set the sale price.

The honest comparison

A renovation of your existing house: $300k–$500k, most of it gone at sale.

A duplex on the same block: everything above, funded by construction finance against the end value, with a gross profit that has typically been around $1.25m on our projects.

The second number is bigger because the second project creates two new assets. The first just improves one old one.

Get a real number

An indicative range is a start. A number you can take to a lender comes from a design and a builder's estimate on your block. That is what the free site assessment produces.

Builds by duplexbuild.com.au · Finishes by reno-build.com.au

Book a free site assessment

All articles